Assignment / Project Number 08
Graphing: Line Graphs and Formulas
How is this project graded?
This project, like the others, is graded on the basis of a maximum ten points.
Remember that there are several goals for the project, including working with formulas, working with line graphs, and working with drawing objects.
If you did not use formulas to create the table of data for the revenue, cost, and profit, or if there was no evidence that you did, or if your table was not sufficient, then you probably lost about four points.
If your graph was not present you probably lost about five points. If the graph was present, but faulty, then you probably lost less. In particular, if you did not have quantity amounts on the X-axes, you lost two points.
If you did not indicate the Breakeven Point with a both textbox and an arrow, you lost one point each.
You needed to turn in the following to the instructor on the date this
assignment was due (check the class schedule):
1) PRINTOUT #1: A printed copy of your spreadsheet, showing
(A) the
data: revenue, cost, and profit for various production levels (you pick the
appropriate levels),
(B) a single graph showing lines for the total revenue and total cost for
various production levels, and
(C) an arrow pointing to the breakeven point on
the graph and a textbox which labels it.
2) PRINTOUT #2: A printed copy of your spreadsheet, showing showing the formulas
on your sheet.
3) DISK FILE: A copy of the disk file on which you have saved your spreadsheet.
The name of the file on the disk should be
"breakeven.xls"
The label on the disk should have YOUR NAME,
and the words:
ASSIGNMENT #08 -- LINE GRAPH
4) OTHER: The above items are all that is required for this
assignment.
This page last modified on 11/06/07.
|
STOP |
This page, all of its parts
(including Amite photo), and all linked
material residing on this web site
|